-- MMU Open Day in Cyberjaya Campus --
As I mentioned in previous post that my colleagues and I went up to Cyberjaya campus one day earlier for booth decoration.
We arrived at about 10.40a.m. and immediately we headed to the Grand Hall and unload our decoration materials to our booth. The location is not strategic at all because visitors could hardly see our booth if they don't come near to that area.
After that, we went to collect our apartment key and we waited for about one hour in the HR office which was located in the new building just opposite the grand hall.
The funniest thing was none of us were around the grand hall to start on the decoration but our boss asked, "Why nobody was in the hall for booth decoration yet?" when he met us in the HR office. It was because only four of us were assigned for the decoration and by the time we met our boss, the four of us were waiting at the HR office because we planned to settle our stuff at the apartment before we start our work.
Afterall, we had our lunch in prior to our work. We started at about 1.00p.m. and we thought it would take us about two to three hours to finish it but somehow it was out of our expectation. Guess what's wrong? The booth was set up using 'shellboard' and we were not provided with double-sided tape. By the time we were able to get the tape, we found out it was not suitable to be used because it didn't work as sticky as we thought. It was short of time and the only thing we could was trying the best to stick the posters and the labels onto the booth. Thus, we ended up to finish at 6p.m. We thought everything would be fine. However, after dinner with our boss, we requested him to 'inspect' the decoration and we took another one hour to have minor modification.
Let's show you some of the photo I took on the booth before the modification.
We arrived at about 10.40a.m. and immediately we headed to the Grand Hall and unload our decoration materials to our booth. The location is not strategic at all because visitors could hardly see our booth if they don't come near to that area.
After that, we went to collect our apartment key and we waited for about one hour in the HR office which was located in the new building just opposite the grand hall.
The funniest thing was none of us were around the grand hall to start on the decoration but our boss asked, "Why nobody was in the hall for booth decoration yet?" when he met us in the HR office. It was because only four of us were assigned for the decoration and by the time we met our boss, the four of us were waiting at the HR office because we planned to settle our stuff at the apartment before we start our work.
Afterall, we had our lunch in prior to our work. We started at about 1.00p.m. and we thought it would take us about two to three hours to finish it but somehow it was out of our expectation. Guess what's wrong? The booth was set up using 'shellboard' and we were not provided with double-sided tape. By the time we were able to get the tape, we found out it was not suitable to be used because it didn't work as sticky as we thought. It was short of time and the only thing we could was trying the best to stick the posters and the labels onto the booth. Thus, we ended up to finish at 6p.m. We thought everything would be fine. However, after dinner with our boss, we requested him to 'inspect' the decoration and we took another one hour to have minor modification.
Let's show you some of the photo I took on the booth before the modification.
The right corner was the place to locate FYP project but the laptop would only 'arrived' on the next morning.
One of my colleague -- Izah was walking around the booth to make sure all the materials didn't fall down before we left for bath.
Here you are. We added a 'Welcome' wordings to enhance the decoration but the booth still looked a bit plain.
No comments:
Post a Comment